Keyera (KFS) – Frac 1/Frac 2 & De-Eth
At Keyera Fort Saskatchewan, Canoco executed multiple turnarounds with nearly 17,000 man-hours. The team delivered zero leaks across 168 bolted joints, supported inspections and wash processes, all with zero incidents or safety violations.
LNG Canada
Location: Kitimat, BC Client: JFJV / LNG Canada Man Hours: 296,434 Scope: Full mechanical support, including specialty welding Compressor scope, mod interconnects, closure welds, valve changeouts Large bore piping up to 72″ Stainless steel and exotic materials No backing gas RMD welding Critical lifts, including precision hand-rigging of 56-ton spools, and valve replacements on 36” 900# systems Material […]
Sherritt Technologies
Canoco completed multiple turnarounds for Sherritt Technologies with over 110,000 hours of maintenance and fabrication. The team achieved zero weld repairs and zero leaks across 1,985 bolted joints, demonstrating exceptional quality and reliability.
CNRL Horizon
At CNRL’s Horizon site, Canoco delivered over 111,000 hours of shutdown and maintenance work, including exotic welding and fabrication. The project achieved 30,000 leak-free bolted joints and a weld repair rate of just 0.61%.
CNRL Conventional
Canoco supported CNRL through emergency COVID shutdowns, evolving into multi-year spring and fall turnarounds. With 55,000 hours logged, work delivered consistent leak-free performance and embedded full-time personnel across Alberta conventional sites.