Keyera (KFS) – Frac 1/Frac 2 & De-Eth

  • Location: Keyera Fort Saskatchewan (KFS)
  • Client: Keyera Corp.
  • Manhours: 16,979.00 and counting
  • Scope:
    • Multiple Turnarounds (Frac 1 , Frac 2 and De-Ethanization)
    • Boilermaker scope in Frac 1 & 2 – Ongoing
      • Blinding and De-Blinding of Multiple Pieces of Static Equipment.
      • 8+ Bundle Extractions and Installation.
    • Routine Shutdown and Maintenance.
    • Support Chemical Wash and HPWW
    • Assist with Facilitate Multiple Regulatory Inspections.
    • Emergency Call Out
  • Outcome:
    • 168 BJIM – Zero Leaks 75 Plugged Tubes
    • Zero Near Misses
    • Zero First Aid’s
    • Zero LTI’s