- Location: Keyera Fort Saskatchewan (KFS)
- Client: Keyera Corp.
- Manhours: 16,979.00 and counting
- Scope:
- Multiple Turnarounds (Frac 1 , Frac 2 and De-Ethanization)
- Boilermaker scope in Frac 1 & 2 – Ongoing
- Blinding and De-Blinding of Multiple Pieces of Static Equipment.
- 8+ Bundle Extractions and Installation.
- Routine Shutdown and Maintenance.
- Support Chemical Wash and HPWW
- Assist with Facilitate Multiple Regulatory Inspections.
- Emergency Call Out
- Outcome:
- 168 BJIM – Zero Leaks 75 Plugged Tubes
- Zero Near Misses
- Zero First Aid’s
- Zero LTI’s
Keyera (KFS) – Frac 1/Frac 2 & De-Eth









