CNRL Conventional

  • Location: Alberta (Conventional sites)
  • Client: CNRL
  • Man Hours: 55,000
  • Scope:
    • Emergency shutdown during COVID developed into ongoing contract
    • Spring and fall TAs from 2020–2024
    • HEX, bundle pulling, blinding/de-blinding
    • Vessel, piping, and shop fabrication
    • Tube plugging, routine maintenance
  • Outcome:
    • Consistently leak-free performance:
    • 2020: 138 bolt-ups – 0 leaks
    • 2021: 532 bolt-ups – 0 leaks
    • 2022: 232 bolt-ups – 0 leaks
    • Embedded Canoco personnel now serve in full-time CNRL roles